1. Home
  2. Products
  3. Ceramic-lined pipes
Product · P02

Ceramic-lined pipes & elbows

Steel pipe lined with alumina tiles, built to your line drawing: straight spools, elbows, reducers and tees, flanged to your standard. For slurry, tailings, fly ash, bottom ash and other abrasive powders.

Looking into an alumina tile-lined steel spool from the flangeLined spool seen from the flange, with labelsALUMINA TILE LININGfitted tile by tile to the boreBOLT HOLESdrilled to your flange standardSTEEL FLANGEpainted to your specification
Lined spool, seen from the flange — Partner factory, Zibo · October 2026

What we supply

What we supply
ItemTypical range*Notes
Straight spoolsAbout DN80–DN600 (3″–24″); lengths to your layout, e.g. 3 m and 4 mFlanged or plain ends
Elbows and bendsAny angle; bend radius as specified, e.g. 1.5D or 3DHeavier lining on the outer radius on request
Reducers and teesTo drawingBranch connections lined to the same grade
Rubber-ceramic lined pipee.g. DN350 in long spoolsFor slurry with impact or pressure pulsation
Alumina tubes and sleevesBores from about 40 mm to 500 mmInserted into steel, or used as replaceable wear sleeves

*Typical ranges from partner factories. Final sizes, lengths and tolerances are confirmed on the quotation.

Lining methods

  • Bonded tiles — the usual choice for slurry and ambient-temperature powder lines.
  • Welded tiles — for larger bores, or where the adhesive's temperature or chemical limits are a concern.
  • Inserted alumina tubes — for smaller bores, where a one-piece lining avoids joints.
  • Rubber-ceramic — where the line also sees impact or pressure pulsation.

The method is chosen by temperature, bore, pressure and particles — not by habit.

Alumina tiles lining the bore of a steel pipe
PHOTO — tile lining seen from the flange
Ceramic-lined steel pipe: cross-section and longitudinal half-sectionFLOWSTEEL PIPEALUMINA TILE LININGtiles bonded or weldedFLANGE TO YOUR STANDARD
SECTION — cross-section and half-section of a lined spool

Hot ash lines

Fly ash can still be several hundred °C where it is collected. If that is above the adhesive’s rating, bonded tiles are the wrong choice; we specify mechanical retention or inserted tubes and confirm the method with the factory engineer before quoting.

What to send us

  • MediumSlurry: solids type, specific gravity, % solids, d50/d80 and largest particle. Dry: powder type and particle size
  • TemperatureMaximum, normal, and how quickly it changes
  • Velocity and pressureIncluding pressure surges, if any
  • PipeSize, wall thickness or schedule, steel grade
  • FlangesStandard and rating, or plain ends
  • LayoutIsometric or drawing: bend angles, radii, lengths
  • HistoryCurrent pipe material, service life and where it fails
Download the duty sheet (Excel)

Questions

Which parts of a line should be lined first?

Where wear concentrates: bends (especially the outer radius), tees, reducers and the spools just after pumps or feeders. Many plants line these first and leave straight runs until wear records show they need it.

Can you match our flanges and lengths?

Yes. Send the flange standard and rating — for example ASME B16.5 Class 150, EN 1092-1 PN16, JIS or AWWA — and the face-to-face lengths or an isometric drawing.

Ceramic-lined, rubber-lined or both?

Alumina resists sliding abrasion by hard, sharp particles and tolerates higher temperatures. Rubber cushions impact and suits many fine slurries at moderate temperature. Rubber-ceramic combines the two. Send the duty and we recommend one, with the reason.

Who is responsible for pressure design?

You or your designer specify pressure, wall thickness and flange rating; the factory builds the steel spool to that specification. We coordinate the documents but do not take on pressure design.

Send the line drawing and the medium.

Bends and spools are made to your layout. With the medium, temperature and flange standard we can recommend a lining and quote.

Email
inquiry@vuulcan.com
Reply
Within one business day (GMT+8)
Based in